Last edited by Nataxe
Friday, July 31, 2020 | History

1 edition of Cost estimating relationship associating engineering drawing quality with installation cost growth for USN ship alterations found in the catalog.

Cost estimating relationship associating engineering drawing quality with installation cost growth for USN ship alterations

Kurt Willstatter

Cost estimating relationship associating engineering drawing quality with installation cost growth for USN ship alterations

by Kurt Willstatter

  • 39 Want to read
  • 30 Currently reading

Published by Naval Postgraduate School in Monterey, California .
Written in English

    Subjects:
  • Operations research

  • About the Edition

    This is an analysis of existing feedback in the Fleet Modernization Program (FMP) planning and design process using the FFG-7 class of ships as a case study. This analysis attempts to relate the engineering drawing revision rate (inverse measure of drawing quality) and the number of ships affected by those drawing revisions (measure of availability concurrence) to the cost growth attributable to the FMP portion of U.S. Navy ship availabilities. Due to the lack of actual cost data, budget estimates were used as a surrogate and unfortunately firm relationships could not be established. However, the methodology developed has potential for application to any large ship class which may experience numerous concurrent availabilities, as actual cost data become available. It is meant to be a tool for the engineering design agent to assess the financial impact of the quality of engineering design products on the installing activities and to assess the potential value of policy changes which improve the quality of those products. Keywords: Data bases, Theses, Regression statistics. (KR)

    Edition Notes

    StatementKurt Willstatter
    ContributionsNaval Postgraduate School (U.S.)
    The Physical Object
    Paginationix, 56 p. ;
    Number of Pages56
    ID Numbers
    Open LibraryOL25509019M
    OCLC/WorldCa81839706


Share this book
You might also like
Report of committee on market ordinance, 1866.

Report of committee on market ordinance, 1866.

Flexible management

Flexible management

fresh map of life

fresh map of life

Jos. Littlefairs letters to America 1941-45.

Jos. Littlefairs letters to America 1941-45.

The American challenge

The American challenge

Reducing poverty among elderly women

Reducing poverty among elderly women

Where do pay rises come from.

Where do pay rises come from.

The life, art, and times of Arthur Wesley Dow

The life, art, and times of Arthur Wesley Dow

Age determination of wildlife

Age determination of wildlife

Confronting the child care crisis

Confronting the child care crisis

Starch and its derivatives

Starch and its derivatives

Means Building Construction Cost Data

Means Building Construction Cost Data

Cost estimating relationship associating engineering drawing quality with installation cost growth for USN ship alterations by Kurt Willstatter Download PDF EPUB FB2